SIMULATION ONLY / SOLAR HYBRID MINI-GRID

Use solar first. Start diesel only when needed.

Every 15 minutes, SunShift reads sunlight, demand, battery level, and generator state. It suggests START, HOLD, or STOP. Safety rules check the choice.

02 / TEST RESULT

What happened in the test.

FUEL REDUCTION22.38%

Loading sealed receipt...

CRITICAL POWER MISSED0 Wh

All critical demand was served.

UNSAFE ACTIONS ACCEPTED0

The safety rules held.

03 / ONE TEST DAY

96 DECISIONS / ONE EVERY 15 MINUTES

See when diesel turns on.

Move through the day. The exact sunlight, demand, battery level, diesel state, and fuel use appear below the chart.

AUDIT-ABUJA-DUAL-11AVAILABLE PV / TOTAL DEMAND
PV DEMAND DIESEL ON
Available solar power and mini-grid demand through the selected dayInteractive trace sourced from the sealed Python trajectory. Exact values appear below for the selected time.
SOLAR SENSORPendingphysical irradiance
DEMANDPendingcritical and flexible
BATTERYPendingstate of charge
GOVERNOR ACTIONPendinggenerator state
FUEL USEDPendingcumulative litres
SEE ALL 12 TEST DAYS The 22.38% result is the total. Some days used more diesel.
04 / PROOF FILES

THE TEST CAN BE REPLAYED

Change a file and the check fails.

Each test day, policy, decision, and plant step has a hash. The replay passes only when they still match.

SSQ / TEST / 001

12 TEST DAYS / FILES MATCH

The old controller and SunShift used the same test conditions.

RESULT FILE
loading...
TEST DAY LIST
loading...
CONTROL POLICY
loading...
SIMULINK INPUT
loading...
06 / LIMIT

SIMULATION ONLY

This demo does not switch real equipment.

A field pilot still needs site data, electrical interlocks, manual override, commissioning tests, and approval by qualified power engineers.